EFFORS-FS - Enhanced Flood Forecasting System for Critical Infrastructures Protection in Medium Size Alpine Catchments

You are here

Modern society heavily relies on a number of critical infrastructures (CI) such as for electricity generation and transmission, water supply, transportation systems or telecommunication. In the Alps, the vulnerability of CI to natural disasters, however, has increased with the growing demand for land and predicted climate change. Regarding floods, appropriate forecasting and warning systems can reduce the potential negative consequences. But up to now, accurate flood forecasts are rarely available for medium size Alpine catchments, where current forecasting technologies do not have the necessary high temporal and spatial resolution.  

EFFORS overcomes this limitation by using space technologies because they allow the integration of insitu measurements and current land surface conditions (snow coverage, land use) within flood forecasting. An international team out of specialists for satellite communication, earth observation, meteorology, informatics, hydraulics and hydrology work hand in hand with user representatives, to elaborate a new system structure aimed at closely meeting the needs of the user communities.

USER NEEDS

The proposed service mainly focuses on two user groups: (A) owners and operators of critical infrastructures who are interested in protecting their assets against floods, and (B) public authorities that are responsible for the management of floods. Other important stakeholders are (C1) insurance institutions that have to compensate for flood damage, and (C2) consulting engineers that are involved in flood risk management. Considering an economic activity approach, the two user categories can further be divided into different subgroups, as depicted in the next figure. 

Almost 30 stakeholders and potential users from the depicted subgroups were contacted to collect information on their needs, use cases and expectations regarding the proposed service. Accordingly, potential users need to:

  • provide warnings and alarms to local communities and public authorities to save life and prevent serious damage to critical infrastructures,
  • know if certain thresholds that are important for the safe operation of critical infrastructures will be reached during the upcoming flood event or not,
  • subsequently decide upon the necessary number of personnel and technical  equipment for flood mitigation and control, and
  • identify how long critical infrastructures will eventually be tampered by the approaching flood wave.

According to the team building it is the actual objective to target Austrian and German users. Nevertheless, development in other countries is also planned for the future.

Service/ system concept

The new service is driven by user and stakeholder requirements on the one side, by technical expert knowledge on the other. The intention of the proposed service is to collect, combine and process heterogeneous data and to deliver the final information directly to the users. The technical concept foresees a network of on-ground sensors to measure key parameters of the area of interest (e.g. water level, discharges, and precipitation). The collected data are transmitted via either satellite or terrestrial communications networks to a processing centre. In order to reduce the communication costs, sensors are activated using threshold values.

The processing centre performs an integration of the data with satellite imagery. These data are inputs of the hydrological model coupled with the hydrodynamic model. In this way, models take into account the floodplains and calculate flood extension, water level and velocity on the floodplain. Post-processing tools should then automatically generate floodplain maps and produce warnings according to the user type. The complete workflow is illustrated on the next Figure. 

Complete workflow

 

Space Added Value

The System is based on two space assets:

  • SATCOM: ensuring quasi real time data communication in critical situations (floods) and in remote areas.
  • EARTH OBSERVATION: for improved (1) precipitation forecasts (2) snow coverage (3) Land Use. 

Earth observation: optical data (e.g. MODIS or SUOMI NPP VIIRS) will be used to determine fractional snow covered areas. Maps of wet snow can be derived from Synthetic Aperture Radar (SAR) in woodless areas. Meteorological information will be provided by ZAMG. 

Meteorological forecasts: These forecasts are of paramount importance because the fast hydrological reactions in medium size catchments force modellers to simulate flood events before rain is falling. Using sensor information, satellite images, and radar information, meteorological forecasts should be done on small spatial cells and short time steps because of the particular chosen Alpine physical environment. 

Satellite communications: Satellite communications is used to transmit the sensor data in near real time to the data processing centre. Satellite communication is not affected by events like floodwater, storms or avalanches. To reduce the costs thresholds are implemented so that satellite communication becomes active only when measured parameters overcome the defined thresholds.

Product Features

SYSTEM ARCHITECTURE

Within the system architecture, developed in EFFORS project, the coupling of all system elements has central importance. This function is provided by a so called “shell”. This is a special software, controlling and coordinating all elements of the system.

The elements of the shell include functions that are used in the phases of building the database, the hydrologic and hydraulic models, including the calibration of the models. The functions of these modules in EFFORS are demonstrated in Figure 1. Main function of the “shell” is to enable the automated operation of the system.

As these elements (see Figure 1) play a central role in the Service Value Chain, all the tasks are coordinated and executed automatically according to the shell configuration.

Before the hydrological and hydraulic model can be used operationally, it is to note that these models must be calibrated.

The system has two very different phases. The first one is the calibration of the hydrologic and hydraulic model. During the second phase the service runs fully automatic. Expert knowledge is only necessary to solve single problems.

The shell coordinates automatically each task defined in EFFORS System Architecture and executes chronologically after the meteorological modelling. Thus in the next step the meteorological forecasts are processed and imported to the hydrological model. After the run of the hydrologic model the 2D hydraulic model starts to work under the shell control.

Figure 1: Overview of functions and input/output data streams managed by the Shell

 

Current Status

The EFFORS feasibility study planned for 12 months started in June 2014 and has been completed with the Final Review on July 1st, 2015. Team members have achieved all deliverables.

This first phase is characterised by two very successful user meetings in Graz (Austria) and in Berchtesgaden (Germany) with around participation of 30 users and stakeholders. Based on the user and the system requirements as well as on the viability analysis, the team defined the system (service definition).

The EFFORS team has prepared a Roadmap which has been submitted to ESA. The consortium has confirmed its interest in initiating and co-funding the IAP Demonstration Project. In this respect, the consortium has prepared an Outline Proposal for a Demonstration Project, which has been submitted to ESA. After its acceptation a Full Proposal will be prepared and submitted for consideration by ESA by mid-November 2015. 

The intention is to complete the Demonstration Phase until the operational one. This will happen during the new project period starting probably January 2016. During the Demonstration phase construction of the EFFORS service for two Pilot areas, one in Germany, one in Austria is foreseen. The EFFORS service will be used as a new tool to support flood forecasting and mitigate flood damages

Project Managers

Contractor Project Manager

Christophe RUCH
JOANNEUM RESEARCH Forschungsgesellschaft mbH
Elisabethstrasse 18/II
A-8010 Graz
Austria
+43 316 876 1489

ESA Project Manager

Thomas Bouvet
ESTEC
Keplerlaan 1, P.O. Box 299
2200 AG Noordwijk
Netherlands

Status Date

Updated: 25 August 2015 - Created: 23 September 2014